Jute BDU Pants
Jute BDU ghillie pants have natural-fiber thread hand tied to nylon netting on the front and back of the garment. Check each product for sizing, colors and pocket options.
These pants are built to order. BDU items usually take about 5 days to build when the base BDU garments are in stock. If we need to source your selected pattern and size, additional time is required. Contact us before ordering if you need your item by a specific date. Build time does not include carrier transit. Add a matching jute BDU ghillie jacket.